翻訳と辞書 |
project network : ウィキペディア英語版 | project network
A project network is a graph (flow chart) depicting the sequence in which a project's terminal elements are to be completed by showing terminal elements and their dependencies. It is always drawn from left to right to reflect project chronology.〔(【引用サイトリンク】 url=http://www.projectauditors.com/Dictionary2/1.8/index.php/term/,62555d9cae535f6f685560ac5b5d.xhtml )〕 The work breakdown structure or the product breakdown structure show the "part-whole" relations. In contrast, the project network shows the "before-after" relations. The most popular form of project network is activity on node (AON)(as shown above), the other one is activity on arrow (AOA). The condition for a valid project network is that it doesn't contain any circular references. Project dependencies can also be depicted by a predecessor table. Although such a form is very inconvenient for human analysis, project management software often offers such a view for data entry. An alternative way of showing and analyzing the sequence of project work is the design structure matrix. == See also ==
* Float (project management) * Gantt chart * Project management * Project planning * Program Evaluation and Review Technique * Bar chart
抄文引用元・出典: フリー百科事典『 ウィキペディア(Wikipedia)』 ■ウィキペディアで「project network」の詳細全文を読む
スポンサード リンク
翻訳と辞書 : 翻訳のためのインターネットリソース |
Copyright(C) kotoba.ne.jp 1997-2016. All Rights Reserved.
|
|